A cross-section of JWCS-delivered fire engineering work across UK metro and power-generation infrastructure. Named client references and testimonials available on request.

Sub-surface January 2020 – October 2022

Bond Street Station — Elizabeth Line

Crossrail / Elizabeth Line

Fire-discipline lead at Bond Street Elizabeth Line station with full GRIP 3-8 ownership of the fire-system scope across the station. Carried the package through a Principal Contractor transition to Crossrail self-delivery and on to revenue-service handover.

Sub-surface July 2016 – January 2020

Tottenham Court Road Station — Elizabeth Line

Crossrail / Elizabeth Line

Fire Detection System Package lead at a central-section Elizabeth Line sub-surface station — detection, aspirating smoke detection, dampers, and gas suppression across detailed design through commissioning.

Sub-surface 2022 – Present

Jubilee Line Extension — Equal Egressibility & EVC Programme

Transport for London

Eight-station retrospective Equal Egressibility, compartmentation, and Emergency Voice Communications upgrade programme across the Jubilee Line Extension. Options Development Report and portfolio-level TRS authorship; station-by-station strategies, refuge provisioning, and London Fire Brigade intervention plans.

Sub-surface 2023 – Present

Kings Cross St Pancras — Belgrove House Ticket Hall

Transport for London

Fire Discipline Lead on the new Belgrove House Ticket Hall at Kings Cross St Pancras Underground station — new-build entry hall with associated enabling works inside the live operational interchange station. Evacuation calculations authored; fire strategy and detailed design validated for the new ticket hall, two new tenancies, and a standalone sprinkler system.

Power generation 2024 – Present

Suppression Systems Modernisation — London Power-Generation Asset

Transport for London — Greenwich Power Station

Fire Discipline Lead at Greenwich Power Station — a Grade II* listed, operationally critical premises with external fuel-oil storage tanks. SFFF deluge upgrade, UV/IR flame detection, FRA authorship identifying pool-fire design scenarios, cooling water demand quantification, and contractor procurement support. Driven by UK POPs Regulations restrictions on PFAS-based AFFF foams.

Sub-surface 2023 – Present

Leyton Station — Step-Free Access & Capacity Upgrade

Transport for London

Fire Discipline Lead on the Leyton Station Step-Free Access and capacity upgrade — co-authored the station Fire Strategy and developed the concept and detailed design for fire system assets. Station signage scheme, temporary worksite planning, S1088 submissions, and Authority-to-Use inspections.

References and testimonials

Direct engineering manager and project manager references at Transport for London, Crossrail / Elizabeth Line, and Tier-1 contracting organisations available on request. Reference letters and project testimonials provided where the client has authorised their release.