Client-side fire discipline lead for TfL on the new Belgrove House Ticket Hall at Kings Cross St Pancras Underground station, a new-build entry hall with associated enabling works inside the live operational interchange station. JWCS validated the fire strategy and detailed design for the new ticket hall, two new tenancies, and a standalone sprinkler system.

The need

The Belgrove House Ticket Hall at Kings Cross St Pancras Underground station is a new-build entry hall, with associated enabling works, inside the live operational interchange station. For Transport for London, the fire strategy and detailed design for the new ticket hall, two new tenancies and a standalone sprinkler system needed validation, and the enabling works had to proceed within the operating station.

What was delivered

JWCS provided the client-side fire discipline lead. JWCS validated the fire strategy report and the detailed design for the new ticket hall, the two new tenancies and the standalone sprinkler system; supported the S1088 approvals through the TfL Fire Compliance Team, including the completion forms; supported the materials compliance through Materials Compliance Register review; and provided field assurance during the construction phase. The S1088 approvals sit within the Fire Precautions (Sub-surface Railway Stations) (England) Regulations 2009 framework, with the TfL Fire Compliance Team as the single point of contact with the Fire Authority, including for any exemption.

Why it matters

New construction inside a live interchange station puts the fire discipline at the interface between the new build and the existing operational asset. JWCS brings client-side validation and assurance to that interface, from design acceptance through to construction.

Scope of work

  • ▸Client-side Fire Discipline Lead for the new Belgrove House Ticket Hall and associated enabling works
  • ▸Validated fire strategy report and detailed design for the new ticket hall
  • ▸Validated detailed design for two new tenancies
  • ▸Validated detailed design for a standalone sprinkler system
  • ▸Materials compliance support (Materials Compliance Register review)
  • ▸Supported the S1088 approvals through the TfL Fire Compliance Team, including the completion forms
  • ▸Field assurance during construction