Skip to main content

Projects

Selected track record

Selected fire engineering track record across Elizabeth line and London Underground stations and power-generation infrastructure: what each project needed, what was delivered, and the services it informs.

Sub-surface January 2020 to October 2022

Bond Street Station, Elizabeth line

Crossrail / Elizabeth line

Quality and field assurance of the fire disciplines at Bond Street Elizabeth line station through to handover, across a change in Principal Contractor, from the integrated fire strategy and S1088 applications to materials compliance and Authority to Use.

Read the project →

Sub-surface July 2016 to January 2020

Tottenham Court Road Station, Elizabeth line

Crossrail / Elizabeth line

The fire detection systems package for a central-section Elizabeth line sub-surface station, covering detection, aspirating smoke detection, dampers and gas suppression, taken from detailed design through commissioning to handover.

Read the project →

Sub-surface 2022 to 2026

Jubilee Line Extension: Equal Egressibility and EVC Programme

Transport for London

Client-side fire engineering for TfL's retrospective equal egressibility, compartmentation and Emergency Voice Communications upgrade programme across eight Jubilee Line Extension stations. JWCS authored the Options Development Report and portfolio-level TRS, and co-ordinated refuge point design, compartmentation upgrades and standardised refuge point signage.

Read the project →

Sub-surface 2023 to 2026

Kings Cross St Pancras: Belgrove House Ticket Hall

Transport for London

Client-side fire discipline lead for TfL on the new Belgrove House Ticket Hall at Kings Cross St Pancras Underground station, a new-build entry hall with associated enabling works inside the live operational interchange station. JWCS validated the fire strategy and detailed design for the new ticket hall, two new tenancies, and a standalone sprinkler system.

Read the project →

Surface 2023 to 2026

Leyton Station: Step-Free Access and Capacity Upgrade

Transport for London

JWCS led the client-side fire discipline on TfL's step-free access and capacity upgrade at Leyton Station, carried out with the station in operation. JWCS co-authored the station Fire Strategy, developed the concept and detailed design for the fire system assets, and led the temporary worksite planning, S1088 submissions and Authority-to-Use inspections.

Read the project →

Power generation 2026

Fuel-Oil Storage Tank Fire Protection: Hazard Assessment and Suppression Optioneering

Confidential infrastructure client

JWCS provided fire engineering on the fire protection of external fuel-oil storage tanks at a power-generation site: a Fire Risk Assessment identifying the design fire scenarios, and suppression optioneering under IP 19.

Read the project →

References and testimonials

References from Transport for London and Crossrail (Elizabeth line) engagements can be requested, subject to each referee's consent.

Request references →