The need
TfL’s step-free access and capacity upgrade at Leyton Station combined new vertical circulation provisions, escape route modifications, and active and passive fire systems specification, all delivered in a live operational station.
What was delivered
JWCS led the client-side fire discipline across the project. JWCS co-authored the station Fire Strategy, developed the concept and detailed design for the fire system assets, and led the temporary worksite planning, the S1088 submissions to the TfL Fire Compliance Team, and the Authority-to-Use inspections and reporting for staged hand-back to operations. Materials compliance review covered the active and passive systems scope, and field assurance through construction closed the loop between design intent and installed quality.
Why it matters
When a station stays open during the works, its fire strategy, fire systems design, temporary worksites and staged hand-back benefit from being carried by one fire discipline. That continuity is what JWCS offers on live-station upgrades.