Temporary Worksite Fire Safety

Fire safety for live operational worksites: temporary worksite design and surveys, worksite fire plans, Authority-to-Use inspections and contractor assurance.

Working inside a live railway environment turns fire safety into an operational problem as much as a design problem. Compartmentation maintained as the team works through it, operational escape routes protected from being compromised, combustible stockpiles managed against a station volume that may also be carrying revenue passengers, and proportional firefighting cover for the asset’s evolving state during construction.

JWCS develops temporary worksite concept designs and pre-mobilisation surveys, authors the Temporary Worksite Fire Plan, and reviews and assures the contractor’s Risk Assessments and Method Statements (RAMS) and Construction Phase Plan under the Construction (Design and Management) Regulations 2015. Where hot works are involved, the contractor is managed through the asset operator’s permit-to-work regime; JWCS does not carry out the works directly.

Authority-to-Use inspections close the loop between paper plans and the physical state of the worksite: documented findings, photographic evidence, and conditions for re-occupation. JWCS has carried out these inspections and reported the findings and re-occupation conditions to the asset operator, which grants Authority to Use, at handover-back from the principal contractor. A worksite that fails an ATU does not get its operational privileges back until the conditions are cleared.

Typical deliverables

  • Temporary Worksite Concept Design and pre-mobilisation survey
  • Temporary Worksite Fire Plan (per construction phase)
  • Authority to Use (ATU) inspection reports
  • Review and assurance of contractor documentation
  • Review and assurance of hot-works and material logs
  • Construction fire interface documentation

Governing Framework

Construction (Design and Management) Regulations 2015Regulatory Reform (Fire Safety) Order 2005Infrastructure-owner permit-to-work regimesTemporary Works where applicable

Lifecycle stages

GRIP 6 / Pathway 5 (construction). Engagement scales from a single phase to multi-phase staged-gate construction programmes.