S1085 Materials Compliance

Product-by-product S1085 assessment for London Underground stations and tunnels, recorded in a Materials Compliance Register at specification and procurement stage.

When you need it

Materials specified, supplied or installed in London Underground stations and tunnels are assessed against S1085, London Underground’s standard on the fire safety performance of materials in stations and tunnel infrastructure. A gap found at handover is expensive: a product that has already been bought and installed may have to come out, or go through a concession. We assess materials at specification and procurement stage, so gaps surface while there is still time to change the product or the evidence.

S1085 reaches further than many teams expect. It covers combustibility, smoke emission and toxic fume emission. It sets its own smoke emission tests rather than relying on the Euroclass smoke sub-classification, and it carries recommendations for the public areas of surface stations as well as requirements for sub-surface stations, running tunnels and locations not effectively separated from them. Our article S1085 materials compliance on London Underground sets out the scope, the exclusions and the evidence in more detail.

What we do

  • Establish where S1085 applies on the project, location by location, from the station’s S1086 classification and the standard’s own scope, and whether any exclusion or relaxation applies.
  • Assess each product on its own test evidence: the accredited test house, the substrate and mounting tested, and the thickness tested, against the product’s intended use.
  • Prepare or review the Materials Compliance Register, recording each product, its location, the evidence relied on and the requirement it meets.
  • Flag gaps before products are bought, and set out the further evidence that would close them.
  • Support the S1641 concession route where a material genuinely cannot comply.

No product is treated as compliant because it was accepted on another job. S1085 compliance does not travel with a product: a change of substrate, thickness or location can change the answer.

How we work

  1. Scope. Establish the station and location classification and which S1085 requirements apply where.
  2. Collect. Obtain the test reports, classification reports and product data for each product.
  3. Assess. Check each product’s evidence against its intended application, one product at a time.
  4. Record. Enter the outcome, the evidence reference and any condition in the Materials Compliance Register.
  5. Resolve. Return a clear list of gaps, further evidence required or products to substitute, and route genuine non-compliance to an S1641 concession.

Materials compliance sits within our fire systems consultancy, alongside the review of active and passive fire protection.

Typical deliverables

  • Materials Compliance Register, prepared or reviewed
  • Product-by-product S1085 assessment with the evidence relied on for each product
  • Schedule of evidence gaps and further evidence required, ahead of procurement
  • Review comments on materials submissions
  • Support for an S1641 concession where a material cannot fully comply

Governing Framework

S1085S1086S1641BS EN 13501-1:2018

Lifecycle stages

Most effective at specification and procurement stage; also engaged on a register in progress or ahead of handover.