BS 9992 Fire Strategy for Railway Stations

Fire strategies for new railway stations and for existing stations in service, under BS 9992:2020, the code of practice for fire safety in rail infrastructure.

When you need it

A new station, a new ticket hall, a step-free access scheme or a capacity upgrade changes how people escape and how a fire is controlled. The fire strategy sets that out, and every other discipline designs to it. For a railway station the governing code of practice is BS 9992:2020, Fire safety in the design, management and use of rail infrastructure. Its scope includes surface, sub-surface and enclosed stations.

Why the station’s class matters

BS 9992:2020 recommends different provisions for surface, enclosed and sub-surface stations, so classifying the station correctly is one of the first decisions in the strategy. On London Underground, the classification comes from S1086. For example:

  • Escape capacity (Clause 14.6). Sub-surface and enclosed stations are designed so that platforms can be cleared within 4 minutes, with travel from the most remote point on the platform to a place of ultimate safety or a protected route within 6 minutes. Surface stations are designed so that platforms can be cleared within 8 minutes and occupants cleared to a place of ultimate safety within 12 minutes.
  • Travel distances (Clause 14.4). On every platform the code recommends at least two exits and no more than 20 m one-way travel to an exit, with exits no more than 100 m apart at enclosed and sub-surface stations. For enclosed and sub-surface stations it refers off-platform travel distances to BS 9999:2017 Table 11.
  • Fire resistance (Clause 44.2.1). Elements of structure, including floors, are recommended to achieve not less than R 60 at surface stations, R 90 at enclosed stations and R 120 at sub-surface stations and shafts serving tunnels, whether or not sprinklers are installed.
  • Reaction to fire (Section 9, Clauses 35 to 37). Materials and finishes carry separate recommendations for surface, sub-surface and enclosed locations. On London Underground, S1085 applies as well; see our S1085 materials compliance page.

What we do

We prepare fire strategies for new railway stations and for existing stations in service. Each strategy sets out the basis of design, the design fires, the escape provisions, the compartmentation, the active and passive systems strategy, the firefighting facilities, and the management assumptions the rest of the design relies on.

The related projects listed with this page involved BS 9992:2020 station work in different roles: the Leyton station Fire Strategy and the Bond Street integrated fire strategy were co-authored; the Belgrove House Ticket Hall fire strategy report was validated, not authored; and the Jubilee Line Extension programme used the BS 9992:2020 refuge methodology. Each project page sets out the role in full.

Escape capacity is calculated to Clauses 14.6 and 14.7 of BS 9992:2020: a hand calculation using the flow rates and walking speeds in Tables 1 to 3, applied to two defined fire scenarios, a fire on a train in the station and a fire within the station structure. Informative Annex A gives worked examples.

BS 9992:2020 notes in its foreword that a fire safety engineering approach to BS 7974 might suit some complex railway premises. Where the prescriptive recommendations do not bound the case, we work to BS 7974:2019, with a Qualitative Design Review and named design fires, and the boundary between the performance-based and prescriptive routes stated plainly.

On London Underground

On London Underground, each Category 1 standard applies alongside the selected code of practice, BS 9992 for a station, by its own scope. Departures are surfaced explicitly, never buried:

  • a planned or known departure from a London Underground standard needs an S1641 concession (“Concessions are planned or known non-compliance to LU standards”);
  • a deviation from the selected code of practice is based on BS 7974 and described in the fire safety strategy, under S1080 Clause 3.3.2; and
  • changes to fire precautions at London Underground stations and shafts where London Underground is the Responsible Person are managed through the S1088 change-control process. Our S1088 submission checklist sets out what a submission needs.

How we work

  1. Designate the premises. Classify the station as surface, enclosed or sub-surface; on London Underground, read its S1086 classification in full.
  2. Confirm the governing code and the standards that apply by their own scope.
  3. Set the basis of design: occupancy, design fires, objectives and assumptions.
  4. Design the means of escape (Clauses 13 to 16), including the escape capacity calculation and refuges for persons of restricted mobility.
  5. Set the fire protection strategy: compartmentation and fire resistance, detection and alarm, voice alarm, smoke control, suppression where provided, and firefighting facilities.
  6. Issue at gate reviews under GRIP, TfL Pathway or the RIBA Plan of Work, with an addendum on any material design change.

Railway stations, not buildings

BS 9992:2020 and BS 9999:2017 are different codes with different scopes. BS 9999:2017 is the code of practice for buildings, and it is not the governing code for a railway station, even where BS 9992 refers to it for a specific provision. For buildings other than dwellings, see our buildings page and fire strategy design.

Typical deliverables

  • Station fire strategy, from concept through to detailed design
  • Escape capacity calculation report to BS 9992:2020 Clauses 14.6 and 14.7
  • Qualitative Design Review (QDR) report where a performance-based route is used
  • Fire strategy addendum for a material design change
  • Fire strategy inputs to S1088 submissions at London Underground stations

Governing Framework

BS 9992:2020BS 7974:2019Fire Precautions (Sub-surface Railway Stations) (England) Regulations 2009Regulatory Reform (Fire Safety) Order 2005S1080S1086S1088S1641

Lifecycle stages

GRIP 3-5 / Pathway 1-5 / RIBA 2-4. Updates issued at gate reviews and on material design change.

Related projects

Insights

Part of our Fire Strategy Design service.

Discuss this service

Senior-led from the first conversation.